Corporate Projects

Large-Scale MEP Case Studies

Real results from our commercial and developer partnerships β€” measurable savings, zero downtime, and certified quality.

Emaar Properties β€” Downtown Dubai β€” 120-Unit Residential Tower
Residential

Emaar Properties

Downtown Dubai β€” 120-Unit Residential Tower

14 weeks AED 2.4MYear: 2023

AED 380K

Annual Savings

Β±0.5Β°C

Avg. Temp Variance

< 6 hrs

Downtime During Install

4.2 β†’ 6.1

COP Improvement

Challenge

Aging central chiller plant causing frequent breakdowns and rising energy bills across a 15-year-old high-rise. The building was experiencing 3–4 major failures per summer, resulting in tenant complaints and an occupancy rate drop.

Solution

Full chiller replacement with high-efficiency Carrier 30XA units (600TR capacity), BMS integration via Honeywell Niagara, and new variable-speed drives on all 12 AHUs. We also installed smart sub-metering on each floor to track consumption.

Results

  • 32% reduction in energy costs
  • Zero unplanned outages since commissioning
  • ROI achieved within 18 months

Scope of Work

Removal and disposal of 2x legacy York chillers
Supply & install 2x Carrier 30XA scroll chillers
BMS integration β€” Honeywell Niagara N4
VSD retrofit on 12 AHU fan motors
Chilled water pipe insulation replacement
Smart sub-metering per floor
Commissioning & 12-month defects liability
"Freshair delivered on every promise β€” our energy bills dropped by a third, and we haven't had a single outage since. The tenants noticed the difference immediately."

Ahmad Al-Rashid

Facility Manager, Emaar Properties

DIFC Office Complex β€” Gate Village β€” 45,000 sq ft Commercial Fit-Out
Commercial

DIFC Office Complex

Gate Village β€” 45,000 sq ft Commercial Fit-Out

10 weeks AED 1.8MYear: 2024

28%

Op-Cost Reduction

LEED Gold

Certification

Β±0.3Β°C

Zone Accuracy

92% ERV

Fresh Air Efficiency

Challenge

Multi-tenant office requiring zoned climate control with strict LEED certification requirements. The existing split-system setup could not deliver the granularity or efficiency needed for Gold certification.

Solution

Complete VRF system design with Daikin VRV-X series, dedicated outdoor air units with energy recovery wheels, COβ‚‚-based demand ventilation using Belimo sensors, and BACnet-integrated smart scheduling across 6 tenant zones.

Results

  • LEED Gold certification achieved
  • 28% lower HVAC operating costs vs. baseline
  • Tenant satisfaction score: 4.9/5

Scope of Work

MEP design & LEED documentation
Supply & install Daikin VRV-X (3-pipe heat recovery)
Dedicated outdoor air system with ERV
COβ‚‚ & occupancy-based demand ventilation
BACnet integration with landlord BMS
Commissioning, TAB, and IAQ testing
ASHRAE 62.1 compliance verification
"The LEED Gold certification was our top priority, and Freshair made it happen seamlessly. Their VRF design gave each tenant individual control β€” exactly what a premium office needs."

Sarah Khoury

Project Director, DIFC Properties

Nakheel β€” Palm Jumeirah β€” Beachfront Villa Cluster β€” 8 Premium Villas
Villa / Residential

Nakheel β€” Palm Jumeirah

Beachfront Villa Cluster β€” 8 Premium Villas

8 weeks AED 960KYear: 2024

AED 180K

Annual Savings

10+ years

Condenser Lifespan

Blue Fin

Corrosion Protection

40%

Callout Reduction

Challenge

Coastal salt-air corrosion destroying outdoor condensers every 3–4 years, leading to costly replacements averaging AED 45K per villa. Homeowners also reported inconsistent cooling and high DEWA bills during summer peaks.

Solution

Marine-grade Daikin units with Blue Fin anti-corrosion coating on all coils, custom fresh-air ventilation with MERV-13 filtration, and a bundled preventive AMC program including quarterly coil washing and refrigerant checks.

Results

  • Condenser lifespan extended to 10+ years
  • 40% reduction in maintenance callouts
  • AED 180K saved across the cluster annually

Scope of Work

Site survey & corrosion assessment (8 villas)
Supply & install Daikin FTKM marine-grade splits (48 units)
Blue Fin coated condenser coils
Fresh-air ventilation with MERV-13 filters
Custom condenser platform risers (anti-flood)
Annual Maintenance Contract (3-year term)
DEWA consumption monitoring setup
"We were replacing condensers every three years β€” now they're built to last a decade. The AMC program means we never have to think about maintenance again."

Mohammed Al-Habtoor

HOA Chairman, Palm Jumeirah Villas

Ready for Your Next MEP Project?

Get a free consultation and project estimate from our commercial team.